MAster12
Member
- Location
- Boston, MA, US
Question regarding a piece of electrical equipment being decomm'd. If the conductors feeding the equipment are taken off the breaker, what does the code say about leaving the conductors feeding the equipment stuffed in the conduit and capping the conduit.
Thanks, Jay
Thanks, Jay