I have a contractor performing an arc flash survey on the 2 office buildings I run, and they asked to have the POCO (Dominion Va.) fill out a Utility Fault Duty & Protection Data Aquisition form, which lists fault duty data, service transformer data, and upstream protection data. Is this a standard practice? I am having difficulty getting information from the POCO. (If anybody has a POC at Dominion Power's engineering dept., I would be forever grateful!)