I wired a rural fire station outside of any type local inspection.
It was 60 x 100 metal building with 8 bay doors.
I wired it all commercially conduit, wire, etc....
They now have built the offices in one of the fire station.
It is an all wood stud structure and will hava all sheetrock hardlid ceiling with a deck on top for storage and possible an upstairs future bunking area if the need should arise.
The topic of wiring the office in NMB keeps coming up.
I would like to complete the project commercially with pipe, wire, mc cable metal boxes etc.... since we're almost done, yet, I cant seem to find anything that would disallow the use of romex in this type of installation.
Other than looking extremely out of place along side what I've already installed is there anything else that might keep this type of stucture being wired with Romex?
JAP>.
It was 60 x 100 metal building with 8 bay doors.
I wired it all commercially conduit, wire, etc....
They now have built the offices in one of the fire station.
It is an all wood stud structure and will hava all sheetrock hardlid ceiling with a deck on top for storage and possible an upstairs future bunking area if the need should arise.
The topic of wiring the office in NMB keeps coming up.
I would like to complete the project commercially with pipe, wire, mc cable metal boxes etc.... since we're almost done, yet, I cant seem to find anything that would disallow the use of romex in this type of installation.
Other than looking extremely out of place along side what I've already installed is there anything else that might keep this type of stucture being wired with Romex?
JAP>.