I am installing a new meter center that has a 600 amp bus and contains 4 separate meters each with 200 amp breakers. The service is single phase, 120/240V. The meter center is being installed in a mobile home community and will serve 4 separate mobile homes.
For incoming service I am planning to use parallel 350kcmil phase conductors.
What size neutral conductor(s) are required or recommended?
For incoming service I am planning to use parallel 350kcmil phase conductors.
What size neutral conductor(s) are required or recommended?