FaradayFF
Senior Member
- Location
- California
Hi guys,
Is it a standard practice to re-pull the existing bundle in a conduit when adding a circuit to existing wiring in a conduit? Example, I've got a 2" PVC that carries 3-#14 conductors and I'm adding 1-4/#14 cable. Do I need to re-pull the circuit that is already there?
Thanks,
EE
Is it a standard practice to re-pull the existing bundle in a conduit when adding a circuit to existing wiring in a conduit? Example, I've got a 2" PVC that carries 3-#14 conductors and I'm adding 1-4/#14 cable. Do I need to re-pull the circuit that is already there?
Thanks,
EE