I have an Nema 3R Motor control center i am installing on a concrete pad. All the conduits are coming in from the bottom of the MCC through the pad. The area is to have Methane in the ground. My question is how would you install seal offs on the conduits and what type would you use? EYS's would be to tall to go in the bottom of the MCC.
Thanks, Robert