Am I intrepreting 250.32 correctly? It seems to require a grounding electrode system as required in part III, cold water, ufer, etc. I am working on a new school with a very large separate building from the service (45,000 sq. ft.) and all they call for is a ground rod at the dist. board. This seems to be a code violation.