I happened to be out walking today near my home and went past some 4 unit residential housing that is being put up. The units were not secured so I stepped into one and the first thing I see posted is the electrical rough in approval. Taking only a few minutes I could see a number of code violations that could have easily been avoided. (1) box fill w/pvc nail on's(mainly 2 gang's with 2 or more over box fill), NM cables improperly stapled(2 round 14/3 secured with half inch stapleles-not rated) NM stapled as close as 3/4 to stud edge, bored holes within 3/4 stud edge with no drive plates, home runs into panel fastened 3 feet from box and the list goes on. Are these types of items something that is usually overlooked because they are petty in nature? I am not perfect, but you would never find any of this type of work on my jobs because we follow the code.