I do Single Family residential homes here in Southern California. I have 1 house that has the ufer sticking up about 2" above the footing. Clearly not enough to instal 3 clamps to to it when the bottom framing plate is installed. I informed the job superintendent about this and he informed the concrete contractor. The concrete contractors fix was to simply weld an extenstion on the ufer. IN the past I have required the concrete company who made the mistake install a ground rod. Does anybody know what the proper procedure is to fix this situation. Is it legal to weld on to the ufer?
Thanks for your help.
Robert