there are two disonnects at the pedestal
.
Do the disconnects have OCP, or are they just disconnects? That only answers the question as to wheather the conductors are feeders or service conductors, but enquiring minds want to know. The neutral between the buildings makes no sense either way.
Also, wouldn't that violate the rule about having the grounded and ungrounded conductors in the same cable or raceway?
I believe you said the wire/conductor has already been run. If so, after the inspector signs off and the final is done, I would disconnect it.:happyyes:
I still think I would have the inspector prove what he is (wrongly) requiring.:happysad: