i installed a 100 ite panel and took the jumper between two neutral bars out and used one for neutral and the other one for grounds with the bond screw installed.
inspector said i cant do that and wants a separate bar...i've been trying to find it in the code but haven't been able to locate it. this same inspector also said i couldn't
staple my 2/3 ser to the bottom of basement joists, wants running boards but i got that one 340.10-4 & 334.15 c.
he also said i need nolox on cu/al rated lugs
anyone direct me to the ground bar issue