Hey guys!
There is no basement
Can't use overfloor raceway
Can't drop from above
It is a display case in hi end store
Marble on concrete
Right in the middle of tile floor, an island
How deep to cut a groove for uf cable
Code would want 4" and/or gfi it. Also
Don't want to have cracks later
How to temp plug the groove after the first night ?
Wedge in a length of wood?
Need obviously the skinniest cable that will carry 3#12s