When installing in a conduit body, should the gasket be removed to ensure the fault current path is adequate?
Are these fittings listed for grounding in a way that allows the EMT to be used as an EGC?
I have heard that the gaskets do not last, so in a few years they are not raintight, and they will not provide a path for fault current. Thoughts?