I have been an electrical contractor for over 30 years and have never had to "ring out" our wiring after the rough-in. We always take our time when roughing in and double check everything visually. Now we are working on a large apartment complex and the super is requiring that we "ring out" our circuits before they close in. What is the easiest way to do this without taking too much time? I can, of course, come up with some guesses as to how to do this but there might be some method out there that I'm not thinking of. Thanks.