puckman
Senior Member
- Location
- ridgewood, n.j.
We are working in a underground cement wiring duct with atleast 30 conductors passing through , we are troubleshooting inside. There is water inside this box which is continualy pumped out, most of the conductors are live with current passing through them, all different size cables from 250 -700 mcm. Is this type of work considered live work ? Duct is about 8'x8'x8'.