florida-sparkey
Senior Member
- Location
- Pinellas Park, Florida
- Occupation
- Master Electrician
Hello,
Need to "bounce one off the guys"
I have a 3ph delta service with an overloaded (by calc) 225 Amp panel. I want to up grade by going to a 400 Amp 3ph meter & feeders, then feeding two panels directly from meter with 2 sets of feeders. # 1 is the original 3ph. # 2 will be a new 150 Amp 1ph to serve 120V loads moved from #1. (Most loads are 1ph, only a/c 3ph.) Both panels will be inside the structure and side by side. I do not want to reinvent the wheel, just remove 120V load from a delta panel.
Need to "bounce one off the guys"
I have a 3ph delta service with an overloaded (by calc) 225 Amp panel. I want to up grade by going to a 400 Amp 3ph meter & feeders, then feeding two panels directly from meter with 2 sets of feeders. # 1 is the original 3ph. # 2 will be a new 150 Amp 1ph to serve 120V loads moved from #1. (Most loads are 1ph, only a/c 3ph.) Both panels will be inside the structure and side by side. I do not want to reinvent the wheel, just remove 120V load from a delta panel.