Ive got fifty metal buildings supplied buy a generator. The gen supplies a MDP that feeds five sub panels, each sub panel feeds ten buildings, each building has a 63 amp load panel. Can I ground multiple buildings to one ground rod, or does each building need its own rod?
System bonding jumper installed at the gen. and EGC's run with all feeders
Thanks
System bonding jumper installed at the gen. and EGC's run with all feeders