Might need to count an extra hour or two every day for lost time with check-in, check-out, waiting for keys, etc.
See if you will need to pay for guards if afterhours work is needed.
Parking. Tool and material storage area.
Keeping things operational (live building) can triple the time for that segment.
Agreed.I have used my gut in the past and I never regretted it.
Do you ever look at a set of prints and get the gut feeling you should not even waste time trying to bid it? Should I listen to my gut?
It is a courthouse remodel. The building are all added on 1908, 1930, 1955 and 1975. Demo of a bunch of areas with the note of you are responsible for knowing everything and keeping power on to all occupied areas as we rip this place apart.