shortcircuit2
Senior Member
- Location
- South of Bawstin
It appears from the article I just read in EC&M that they have changed the altenate means for the fabrication of a perimeter bonding grid in the field from a single #8 conductor back to what was required in the 2005 code cycle which is the 12x12inch Network of #8 bonded at all points of crossing in the grid.
The article comments that "Fortunately, this provision isn't used often"
shortcircuit2
The article comments that "Fortunately, this provision isn't used often"
shortcircuit2