ElectricFuzz
Member
Hi, I recently ran into a problem with an inspector.  I had 2x2 flourescent fixtures mounted in a suspended ceiling.  They were cord and plug connected above the ceiling with a 14 gauge SJT cable.  The ceiling is a plenum ceiling.  The inspector told me I could not do this.  Why?  I thought SJT was rated for plenum.
	
		
			
		
		
	
				
			 
				
 
 
		 
 
		 
 
		 
 
		