Hi,
House inspector is requiring me to redo neutral and ground terminations in service panel because 2 wires are terminated under some lugs. I have always been allowed to do this in the past, this is a new one on me.
	
		
			
		
		
	
				
			House inspector is requiring me to redo neutral and ground terminations in service panel because 2 wires are terminated under some lugs. I have always been allowed to do this in the past, this is a new one on me.
				