Looking at 220.55, and 210.19(A)(3), I'm left a little confused. Look at this graphic:
		
		
	
	
		
	
If I have a 6 kW wall oven, fed by EMT, with 75?C terminations all around, could I feed this oven with a 25A breaker with 12 AWG THHN in EMT?
	
		
			
		
		
	
				
			
	If I have a 6 kW wall oven, fed by EMT, with 75?C terminations all around, could I feed this oven with a 25A breaker with 12 AWG THHN in EMT?
				