- Location
- Windsor, CO NEC: 2017
- Occupation
- Hospital Master Electrician
Looking at 220.55, and 210.19(A)(3), I'm left a little confused. Look at this graphic:
If I have a 6 kW wall oven, fed by EMT, with 75?C terminations all around, could I feed this oven with a 25A breaker with 12 AWG THHN in EMT?

If I have a 6 kW wall oven, fed by EMT, with 75?C terminations all around, could I feed this oven with a 25A breaker with 12 AWG THHN in EMT?