I am designing a facility that is requiring 26 Level 2 Electric Vehicle Charging Systems (EVCS).  Art. 625 states that EVCS shall be considered to be continuous loads.
The issue I'm having is that I can not find a reference in the 2011 NEC that allows or disallows the use of a demand factor. Since not all of the charging stations will probably not be used at the same time, nor for the entire day. Once a vehicle is charged, it stops charging, or goes into a maintenance charging state.
I was wondering if there is a code or rule of thumb to use for the demand code for the EVCS.
Thanks.
	
		
			
		
		
	
				
			The issue I'm having is that I can not find a reference in the 2011 NEC that allows or disallows the use of a demand factor. Since not all of the charging stations will probably not be used at the same time, nor for the entire day. Once a vehicle is charged, it stops charging, or goes into a maintenance charging state.
I was wondering if there is a code or rule of thumb to use for the demand code for the EVCS.
Thanks.
 
				
 
 
		 
 
		