I have recently been told that when I bond the hot and cold water and gas at the water heater that this now has to be done with a continuous GEC from the ground rod with the service. This is the first I have heard of this and do not see the change in the 2011 NEC book. As far as I know the main panel,ground rod, and water main are bonded together continuously, and then on the interior at the hot water heater it is the gas with hot,and cold water pipes. please help me with my ignorance with residential installations