alfonso1900
Member
We are working on the design of a house that is going to be feed with 480V 3 phase service. The question is how do you size the low voltage transformers for the 120/208V distribution panels? Do you use the dweling unit calculations (which apply more to the service size and has derating) or do you prepare a panel scheduele that includes the loads (like in comercial work)? If i go one way the transformer could be undersized, if i go the other way it could be oversized. Sugestions?