I had something similar with a business owner that did not want to pay for a three phase service, I had to install a 1200 amp single phase service, and the poco engineer had the crews move all of the residential transformers to the other two phases on the high line. He was getting a cheaper kw rate because the poco billed all single phase loads at the residential rate.