I have a feeder 900' long 2 sets of 500 Mcm each set in separate 4" underground conduit at 460 Volt and it is protected with 400Amp fuses.
I would like to increase a fuse to 600Amp.
My question: Can I load this feeder at 100% (600Amp) or in need to be protected at 80 % (480Amp) of max load?
This is a feeder to the separate building (school).
	
		
			
		
		
	
				
			I would like to increase a fuse to 600Amp.
My question: Can I load this feeder at 100% (600Amp) or in need to be protected at 80 % (480Amp) of max load?
This is a feeder to the separate building (school).
 
				
 
 
		