Hello,
This is my first post here.
I spent WAY more time than I should have today looking for a definative code section to verify that conductors are required to be pulled out of an installation, back to the closest junction box, if equipment is being removed and the circuit is being decommissioned. Then they need to be disconnected and taped of at both ends as I understand it.
I researched "demolition", "removal" and a host of other topic names in the NEC Index.
I have looked for this previously in my career also. (I'm pretty sure I found something too).
Can someone please point me to the code?
Thanks,
Bill
:dunce: - demolition, conductor, removal, termination, abandonment.
This is my first post here.
I spent WAY more time than I should have today looking for a definative code section to verify that conductors are required to be pulled out of an installation, back to the closest junction box, if equipment is being removed and the circuit is being decommissioned. Then they need to be disconnected and taped of at both ends as I understand it.
I researched "demolition", "removal" and a host of other topic names in the NEC Index.
I have looked for this previously in my career also. (I'm pretty sure I found something too).
Can someone please point me to the code?
Thanks,
Bill
:dunce: - demolition, conductor, removal, termination, abandonment.