Steelhead
Senior Member
- Location
- Southeastern Wisconsin
- Occupation
- Industrial Maint/Journeyman
Can anyone give me a reference in the 2008 NEC where it specifically states that the 1/0 rule doesn't apply when running EGCs in parallel. Is it assumed based on table 250.122? I know the rule but I can't find where it states the exception.
Thanks in advance!
Thanks in advance!