I'm working on an industrial plant where I have to run a 3/4" metal conduit (THHN cable 2/C#12 + 1/C #12G). from the load to the existing pipe rack there is 30 feet live street where I cant install any T- support/poles accross. How can I route and support that conduit for 30 ft before I reach the existing rack support?