Situation: Underground service from utility transformer, pokes up at a tapbox above grade and goes back underground to a second tapbox above grade; Does that above ground tap require a disconnect on feeder side (each tap feeder does have a disconnect off of the service)?
My understanding is the tap rule would allow this, but does going underground then poking up and back underground require some other protection means, especially that the taps are required to be accessible?
My understanding is the tap rule would allow this, but does going underground then poking up and back underground require some other protection means, especially that the taps are required to be accessible?