6-2 MC from the panel to the back of an LB.
Unsheathed the MC from the LB and then EMT from the LB directly into a plastic Tesla Wall connector.
A simple run (MC to LB to EMT).
Is this not an acceptable bond? There is an inspector in the area that is failing jobs because he wants a JBox and not an LB as the point of transfer....says the LB is not able to carry a proper bond like the JBox is.
I was under the impression that MC is actually conduit and so is an LB (a conduit body) and EMT is also obviously conduit.
Thanks for any comments and code interpretation.
Unsheathed the MC from the LB and then EMT from the LB directly into a plastic Tesla Wall connector.
A simple run (MC to LB to EMT).
Is this not an acceptable bond? There is an inspector in the area that is failing jobs because he wants a JBox and not an LB as the point of transfer....says the LB is not able to carry a proper bond like the JBox is.
I was under the impression that MC is actually conduit and so is an LB (a conduit body) and EMT is also obviously conduit.
Thanks for any comments and code interpretation.