Inspector Daryl
New User
- Location
- Yuba City, CA 95993
- Occupation
- Building Inspector
I have solar installers that are installing new sub-panels and moving breakers from the main panel to the sub-panel and when they transfer the conductors they are not transferring the grounding conductor with the non-grounded and grounded conductors to the new sub-panel.
I told them that they needed to transfer all the conductors including the grounding conductor for each circuit and identify all the conductors in that circuit with an approved method zip ties or tape.
The installers are asking for a code section and I can't seem to find one. Can you please help.
Thank you
Daryl
I told them that they needed to transfer all the conductors including the grounding conductor for each circuit and identify all the conductors in that circuit with an approved method zip ties or tape.
The installers are asking for a code section and I can't seem to find one. Can you please help.
Thank you
Daryl