We are replacing a 100A Main breaker load center in a resi property. This particular service drop is a single 100A meter and drop. Next to this meter is a 200A service drop powering (2) 100A panels. All 3 panels are in same room in basement. Currently only a single ground rod with #6 Cu running to it and that is the ONLY ground present, no panels bonded either.
Do we need to include the 200A service into our calc for determining water pipe ground size?
Do we need to bond the other panels to the one we are replacing?