Hello everyone, I work for an local government agency (county govt) at a water reclamation facility, I have my master license and have 20 years in trade, 12 years industrial electrical construction and 8 years as electric shop management. My question is do I need a permit to add a circuit in an existing building? Or if I was to be replacing a Control Panel at a metering station that has a 120v metering can provided by power co.? I always though local government bodies were exempt from having to pull permits and get inspections for small electric jobs like this. I can understand if I was doing a ground up type job or a complete MCC replacement. What are you thoughts and experiences? Im looking it up in NEC under enforcements, but nothing really stands out in the 2014. Thanks in advance.