When upgrading a house from 100 amp to 200 amp, I know the wires have to be changed from the meter base up to where it ties in overhead from the pole transformer. Do the wires have to be changed from the pole to where it ties into the meter? Or are these wires already rated for up to 200 amp?
Thanks!
Thanks!