Joelengrahm
Building Inspector ll
- Location
- Dixon, Ca
- Occupation
- City Building Inspector ll
Hello,
I am looking at a split bus 200 amp mlo panel that has existing 50 amp pv backfeed breaker. The PV company is attempting to add an additional 20amp.I believe the 70amps back feed overloads the bus or service wires which company state is 2/0 AL.
any help would be appreciated.
I am looking at a split bus 200 amp mlo panel that has existing 50 amp pv backfeed breaker. The PV company is attempting to add an additional 20amp.I believe the 70amps back feed overloads the bus or service wires which company state is 2/0 AL.
any help would be appreciated.