I have a situation where an existing building has service outside with a bus and few spare enclosed breakers and future spare meter location for future use. They built this building with an expectation that at some point they will expand by adding additional small building (3000sqft building for office type space). The new building will be about 10 feet away from the existing building. The existing service has more than enough power to feed the new building. My question is, would i be able to feed this new building with the existing service provided and use the spare location for an enclosed breaker and meter (because they are going to rent it out to a different tenant), and provide a new panel inside this new building somewhere with a main circuit breaker? Or does this new building require its own separate service from the utility since technically the new building and old building are not connected.