Strombea
Senior Member
- Location
- Prescott, Arizona, USA
Sorry for opening this can of worms again, but I have a situation with a small manufactured home acting as a guest house being fed from a 200 amp main panel at the house so this really is just a branch circuit feeder not a service. I'm feeding it with 80 amps. It's 100 ft away from the house, wheels taken off and tied down to a footing system. Is this considered a structure? Is it mobile? If it's not a service then the grounds are not required correct? And if they are, when would a 2nd supplemental rod be required?