TESERVICES
Member
- Location
- New Jersey
- Occupation
- Electrician
Hello everyone,
I installed a new 100 amp electrical panel and on the top I put a trough and joined them by three inch and a half EMT pipes which measure 28 "to eliminate the MC reaching the panel due to the fact that it is mounted on the wall. all tracks reaching the trough are #12. But now the inspector tells me that from the trough to the panel I must go down with cable number 10 since the pipe is longer than 24”. Is this correct, if someone could tell me in which code chapter I could find this rule. thank you
I installed a new 100 amp electrical panel and on the top I put a trough and joined them by three inch and a half EMT pipes which measure 28 "to eliminate the MC reaching the panel due to the fact that it is mounted on the wall. all tracks reaching the trough are #12. But now the inspector tells me that from the trough to the panel I must go down with cable number 10 since the pipe is longer than 24”. Is this correct, if someone could tell me in which code chapter I could find this rule. thank you