690.47(B) basically says you can have an auxiliary grounding electrode and size it per 250.66.
Article 250 already allows this in general, is there something I am missing here?
The entire paragraph is just saying you can do stuff 250 already says you can do.
Article 250 already allows this in general, is there something I am missing here?
The entire paragraph is just saying you can do stuff 250 already says you can do.