Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
So feeling pretty shit$y. Started with new company about 1 yr ago. Probably closed(estimated) about $4M worth of work.
One of those jobs is a $2M dollar job that we took tight. Reviewed it with the owner before putting in final price.
It's a 1.5 year job with (15) typical 1,500 sq ft areas of only lighting, power. and data drops. All work is contained to that area. Not a lot of work but think I took it low and we may lose money based on billing so far. I think the estimate was def light in some areas.
I've only lost money on very few jobs in my 20 years of doing this. Just that company is struggling for work so not the best of time to take on a loser and they really are good people.. may lose 15% based on forecasting.
Anyway, thought I'd vent.
One of those jobs is a $2M dollar job that we took tight. Reviewed it with the owner before putting in final price.
It's a 1.5 year job with (15) typical 1,500 sq ft areas of only lighting, power. and data drops. All work is contained to that area. Not a lot of work but think I took it low and we may lose money based on billing so far. I think the estimate was def light in some areas.
I've only lost money on very few jobs in my 20 years of doing this. Just that company is struggling for work so not the best of time to take on a loser and they really are good people.. may lose 15% based on forecasting.
Anyway, thought I'd vent.
