Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
When conduit(s) are running as shown how often do you get the conduits in before the wall is up? If your not ready prior to wall going up then you must sleeve correct? I assume based on practicality most often horizontal conduit are installed prior to wall going up obviously. Vertical conduits usually get sleeves installed prior to slab being poured as I don't think those conduits go in prior to slab.
Note - There is a block wall shown.

Note - There is a block wall shown.
