I’m going down to look at this job next week.
I haven’t done a lot of the larger industrial Generacs yet.
They have a 130kW Generac installed, and they say they have a 1200 Amp main.
Right now, the generator only runs 2 of the 8 sub panels, through two 200 amp ATS.
They want to run the entire facility
I see that Generac has specs sheets for 1200 Amp ATS, but I haven’t seen any actually for a sale. Rep at the supply house is looking into it for me.
There is a 1200 amp main, with distribution, with 8, 200 amp sub feeds.
The other option is to mount a giant can, and run a feed to 8 individual ATS from the load side of each sub feed.
Any glaring advantage or disadvantage to either option?
The room is fairly small, so I would probably put whatever I decide on outside. I doubt there’s room for the spiderweb of conduits on the inside.
I haven’t done a lot of the larger industrial Generacs yet.
They have a 130kW Generac installed, and they say they have a 1200 Amp main.
Right now, the generator only runs 2 of the 8 sub panels, through two 200 amp ATS.
They want to run the entire facility
I see that Generac has specs sheets for 1200 Amp ATS, but I haven’t seen any actually for a sale. Rep at the supply house is looking into it for me.
There is a 1200 amp main, with distribution, with 8, 200 amp sub feeds.
The other option is to mount a giant can, and run a feed to 8 individual ATS from the load side of each sub feed.
Any glaring advantage or disadvantage to either option?