Jpflex
Electrician big leagues
- Location
- Victorville
- Occupation
- Electrician commercial and residential
Why does today’s daily graphic code show what appears to be a zip tie securing two MC / AC cables within 12 inches of the metal box instead of listed hole straps?
Also I’ve always placed a jumper between the metal box and receptacle ground connector. Is this completely necessary to do for every single metal box, especially when using EMT as a raceway?
The ground wire would be a second EGC, the receptacle can be grounded to the box with screws at non raised portions of the metal faceplate and removing the receptacle wouldn’t disturb the EGC continuous connection because of the EMT.
Also I’ve always placed a jumper between the metal box and receptacle ground connector. Is this completely necessary to do for every single metal box, especially when using EMT as a raceway?
The ground wire would be a second EGC, the receptacle can be grounded to the box with screws at non raised portions of the metal faceplate and removing the receptacle wouldn’t disturb the EGC continuous connection because of the EMT.
