I'm putting in empty wireways that will intercept empty 3ft x 3ft x 3ft pullbox for electricians to make splices and transition to MC cable.
This pullbox will be used to feed 30 apartments with MC cables.
For worst case scenario, is a 3ft x 3ft x 3 ft pullbox big enough to make (90) 3/0 wire splices? I'm sure this will require those polaris to make the splices
If you're curious how I got 90, it's 3 conductors per apartment, so 30 apartments totals 90 conductors to splice.
This pullbox will be used to feed 30 apartments with MC cables.
For worst case scenario, is a 3ft x 3ft x 3 ft pullbox big enough to make (90) 3/0 wire splices? I'm sure this will require those polaris to make the splices