Just wanted some opinions from you guys on best way you’d do this. The electric company ended up doing the underground feed about 12 ft away frim where the panel is going. I cannot put the panel where the meter is is going.
Would you just run the wire through the 2x6’s to the panel or put it in conduit? 2” conduit hole would be just a tad over the 40% cut out allowed so it’d have to be smaller which would be a pain to feed it because of a couple bends.
No i spections where I am but I still follow code.
The wall will be sheetrocked eventually. I’ve never had to run the se cable that far inside so figured I’d ask.
Thanks!
Would you just run the wire through the 2x6’s to the panel or put it in conduit? 2” conduit hole would be just a tad over the 40% cut out allowed so it’d have to be smaller which would be a pain to feed it because of a couple bends.
No i spections where I am but I still follow code.
The wall will be sheetrocked eventually. I’ve never had to run the se cable that far inside so figured I’d ask.
Thanks!