I’m installing a 200 amp service at a new construction. The meter socket has a 200 amp breaker and is installed 300 feet from house. I’m putting an emergency disconnect on house. Do I have to considered the breaker at meter the first means of disconnect and bond there? Or can I just run 3 wire to house and bond at emergency disconnect?