I am working on a design where the contractor added plumbing and exhaust vents in the middle of the array area and want to know how far a PV module must be from one of those vents. Assume this is in the middle of the roof and the project already has fire path access satisfied on the edges and every 150' of array.
Is there a code that prescribes what the minimum setback should be from a plumbing or exhaust vent to a solar module?
Is there a code that prescribes what the minimum setback should be from a plumbing or exhaust vent to a solar module?